OPTIMAL PLANNING OF INTEGRATED ENERGY SYSTEM CONSIDERING SWAPPING STATION AND CARBON CAPTURE POWER SYSTEM

Optimal planning of integrated energy system considering swapping station and carbon capture power system

Optimal planning of integrated energy system considering swapping station and carbon capture power system

Blog Article

An optimal planning method for an integrated energy system diamond painting strand en zee (IES) considering electric vehicles (EVs) swapping station (SS) and carbon capture power system (CCPS) is studied in this paper.Firstly, based on the analysis of swapping EV load, the model of SS is established.Then, we built the models of CCPS, and other energy supply and storage equipment in IES.

Based on this, the annual comprehensive cost of planning is regarded as the optimization objective, a planning model of IES considering SS and CCPS is developed, and s?n nhà màu n?u ??t solved by CPLEX.Finally, an actual case was analyzed to verify the feasibility and effectiveness of the planning method proposed in this paper.

Report this page